Local Sports Centre

Project Type: Local Authority, Sports Centre Project Duration: Duration 8 months..

Local Sports Centre

Project Type: Local Authority, Sports Centre

Project Duration: Duration 8 months

Project Description: Trend IQ3 based system with open protocol integration to Tridium based AHU control system and Grundfoss pumps via ModBus. Very widespread use of open protocols gave the client a modern future proof BEMS offering fully functional integration of the HVAC system at a much-reduced capital cost.

Project Outcome: The project ultimately is a very good example of how seamlessly modern HVAC control systems can integrate with each other when all parties fully commit to the project.